How to cost and price a rate build up

In this article

Costing and pricing a rate build up

Once you have defined the structure of your product(s), you will need to establish your costs, and ultimately your price. This can be done product by product or you can wait until you have completed the structure of all your products, entered quantities into the bill, and sought best pricing from suppliers and subcontractors using the 'Quote Request' functionality built into Chalkstring. 

> Back to top

Contingency

    The first cost that you are likely to firm up within each product, perhaps whilst waiting for supplier quotes, is the level of contingency you are allowing per component. Contingency is a ‘cover all’ pot of money that will be available to users onsite to purchase and pay for anything that hasn’t been specifically identified within the scope of the rate build ups. This may include items such as PPE, fixings, sealants and adhesives, plant or day work. It can be anything you need to cover costs for, but don’t have the information or inclination to specifically quantify within your product rates.

    > Back to top

    Applying quotes

    Once you have defined your scope of work requirements, quotes can be applied to assign prices to the materials, labour activities and supply & fit elements of your scope to give you your package price to deliver the project.

    How to apply quotes

    A.  Hover your cursor over the 'Assessment actions' menu and click on the button for the type of quote you wish to apply, whether material, labour or supply & fit.

    B. Click the 'Apply Quote' button in the top right corner.

    1. Use the filters as required to search the available quotes.
    2. Click the quote you want to apply to the assessment.

    C. If you already have a quote applied, and only want the quote your currently applying to update the elements where it is offering cheaper prices,  tick the 'Only apply where cheaper?' box. 

    D. Click ‘Apply’ and the quote will be applied to the rate build up.  

    Chalkstring will cross check a quote against every material/labour activity in all your products and apply prices automatically. You can apply a whole quote as it stands, or only the materials/activities from that quote that are cheaper than an existing selected quote, therefore cherry-picking best prices from a range of suppliers

    Changing individual prices

    As well as applying a quote to an entire assessment, prices can also be set at an individual material, labour or product level.

    How to change an individual price 

    A. Click the 'eye' icon to open the product details.

    B. Click the 'Edit' button  next to the quote section to open a list of any existing rates in Chalkstring.

    C. Any current valid rates will be listed with a white background.

    D. If the item already has an assigned price, it will have a yellow background and a blue 'Current price' flag.

    E. If Chalkstring contains any guesstimates created by you or your colleagues, they will be displayed with an orange flag.

    F. Any historical prices, such as expired or archived quotes, will be displayed at the bottom of the list with a grey background and will show red flags.

    G. If a rate you require does not currently exist, a new guesstimate can be added by clicking '+ Add Guesstimate' button in the top right corner and completing the fields.

    Fixing a product price

    If you have already agreed a price for a product with your client, you can manually set the price, and the OHP will be calculated out automatically for you. 

    1. Click on the white ‘padlock’ symbol on the price line of the product you want to fix the price for.

    2. Enter in the agreed price.

    3. Click update the fixed price (you can also unfix a price here if already fixed and you no longer require it to be).

    4. Once saved, the padlock will change to black to indicate that the price is fixed.

    A white open padlock means the price has not been manually fixed and is established by costs plus margins. A black closed padlock means the price has been manually fixed and the margin is established by the difference between that and the costs.

    How to view a costs summary of a product

    Once all products have been priced, you can view a summary of the pricing by clicking the price total each product.